Check the plot documents
Make sure the title, lease and allotment documents are clear and the plot is free of disputes. Confirm the plot size and the bylaws that apply (setbacks, number of floors, covered area).
Soil test
A soil investigation tells the structural engineer what foundation the ground needs. It costs little compared with fixing a wrong foundation later.
Architectural design
Decide how many portions, bedrooms and parking you need. Look at ready designs to save time, then adjust them to your plot.
Structural design
A qualified structural engineer prepares foundation, column, beam and slab drawings. Never build an RCC house from guesswork.
Building plan approval
Submit the drawings to the Sindh Building Control Authority (SBCA) or the relevant authority (e.g. DHA, cantonment board) and start only after approval. Requirements and fees differ by area, so check with the authority for your plot.
BOQ and budget
Get a bill of quantities with specifications and brands. Keep 10% of the budget as a contingency. Use the calculator for a first figure.
Contract with clear stages
The agreement should state scope, specifications, time, payment stages linked to completed work, and how changes are priced.
Supervision and quality checks
Check steel before every pour, test concrete, and make sure curing is done. See our quality checklist.
Utility connections
Apply for electricity, gas and water connections in time; they can take weeks.
Snag list and handover
Before the final payment, walk through every room with the contractor and list defects. Ask for as-built drawings and warranties for fittings.
Living abroad? We manage construction for overseas Pakistanis with regular photo updates in our client portal. See construction support for overseas Pakistanis.

