Before concrete is poured
- Steel matches the drawings. Count bars and check their diameter in columns, beams and slabs against the structural drawings.
- Cover blocks are in place. Steel must not touch the shuttering; concrete or plastic cover blocks keep the right cover so the steel does not rust.
- Shuttering is strong and clean. No gaps that leak cement slurry, and props are firm.
- Conduits and pipes are fixed before the pour. Cutting slabs later weakens them.
During and after concrete
- Mix and water. Concrete should be mixed in the specified ratio; adding extra water makes it easy to pour but weak.
- Compaction. A vibrator should be used so there are no honeycombs.
- Cube test. Ask for test cubes from important pours and have them tested at a lab.
- Curing. Slabs and columns must be kept wet for the specified period (commonly at least 7 days, longer is better). Poor curing is one of the most common causes of cracks.
Walls, plaster and roof
- Bricks are soaked and joints are filled. Dry bricks absorb water from the mortar and weaken the bond.
- Walls are in line and plumb. Check with a string and a level; correcting later wastes plaster.
- Plaster is cured and has chicken mesh at joints between concrete and brick to reduce cracks.
- Roof waterproofing is tested with a water ponding test before tiles are laid.