Karachi construction bylaws and building plan approvals — A guide for homeowners, developers and contractors preparing to build, extend, renovate or redevelop a property. Official reference links checked 23 November 2026.
Find your authorityDesign checksApproval checklistCommon questions
Start with the plot documents
Use the plot number, scheme or phase, lease or allotment record and sanctioned land use to identify the land-owning agency and the authority that sanctions your building plan. Ask which agency issues the site plan, demarcation, forwarding letter or NOC, if required. Plot size alone cannot establish the permission for an extra floor, basement or commercial use.
What to check before freezing the design
- Permitted use and building envelope. Verify residential or commercial use, road width, setbacks, lot coverage, floor-area ratio, height, allowed floors and basement restrictions for the specific plot.
- Access and circulation. Check parking, driveway access, stairs, exits, accessibility and any applicable fire-safety or lift requirements. Identify the required clearances early for plazas, clinics and public-access projects.
- Structure and services. Coordinate architecture with structural design, soil investigation where needed, drainage, ventilation, electrical and plumbing routes. Confirm submission and sign-off requirements for the relevant professionals.
- Alterations and redevelopment. Compare the proposed work with the sanctioned drawings. Obtain the applicable revised plan or permission before changing the structure, footprint, floor count or use. Check demolition permission separately.
From survey to completion
- Collect title, lease or allotment documents, proof of ownership or authorization, the survey or site plan, and any existing sanctioned drawings.
- Confirm jurisdiction, land use and applicable scheme conditions. Obtain the authority’s current checklist, fees, drawing formats and required NOCs.
- Have the relevant professionals coordinate and submit the required plans, sections, elevations and supporting documents. Keep the written sanction and approved drawing set on record before starting regulated works.
- During construction, follow the sanctioned drawings and record the inspections or notices applicable to the project. Submit revisions for approval where required before carrying out changes.
- At completion, assemble the approved plans, inspection records and completion documents. Apply for completion or occupancy permission through the applicable process before occupation where required.
Please contact us for office building, home and bungalow design & approval (SBCA / society), farm house and cattle farm design and construction.
Frequently asked questions
Can I build Ground + 3 or Ground + 5 on my plot?
Ask the sanctioning authority to confirm the allowed use, height, floor count and other controls for your plot. A concept plan or 3D render is a design reference. Building work requires the applicable written approvals.
Is my land-agency NOC the building-plan sanction?
Check the title and scope of each document. A forwarding or land NOC may be a submission requirement. Ask for the building-plan sanction and its approved drawing set separately where applicable.
Where can I find the controlling numbers?
Use the applicable authority’s current notified rules, amendments and plot or scheme conditions. The LDA and MDA links above are enabling Acts. Obtain the plot-specific building controls from the relevant offices.