Most house construction quotes in Karachi are split into two parts: grey structure and finishing. Contractors do not always mean the same thing by these words, so two quotes can look very different. Use this checklist to make sure you compare like with like.
Grey structure usually includes
- Site clearing, layout, excavation and backfilling
- Anti-termite treatment and plinth protection
- Foundation, columns, beams and slabs (RCC) with steel as per structural drawings
- Damp proof course (DPC)
- Brick or block masonry for outer and inner walls
- Electrical conduits and boxes, plumbing and drainage pipes inside walls and slabs
- Cement plaster on walls and ceilings
- Roof waterproofing and insulation, rain water pipes
- Underground and overhead water tank structures
Finishing usually includes
- Floor and wall tiles, marble on stairs and sills
- Doors and frames, windows (aluminium / UPVC / wood) and glass
- Kitchen cabinets, counter top and sink
- Bathroom sanitary ware and fittings
- Electrical wiring, switches, sockets, lights and distribution boards
- Paint, polish, false ceiling (if specified)
- Main gate, grills and railings
Often left out — ask about these
- SBCA approval, architectural and structural design fees
- Utility connection fees (K-Electric, SSGC, water and sewerage)
- Boundary wall, landscaping, solar system, air conditioners, wardrobes
- Curing water, electricity during construction, watchman
Ask every contractor for a BOQ (bill of quantities) with brands and specifications. A lump sum without a BOQ is hard to compare and hard to control. We prepare BOQs as a service too — see BOQ & cost estimation.
Labour-only or material + labour?
In a labour-only contract you buy the material yourself and the contractor supplies labour. It can look cheaper but you carry the risk of wastage, price changes and delays in supply. In a material + labour (turnkey) contract the contractor is responsible for both, against an agreed specification. Whichever you choose, write the specification and payment stages into the agreement.
Estimate both parts for your plot with our cost calculator.