120 Sq Yd House Construction Cost in Karachi (2026)

What a 120 square yard (25' x 43') house costs to build in Karachi today, for ground + 1 and ground + 2, and what makes the price go up or down.

Al-Saeed Enterprises · 12 October 2026

A 120 sq yd plot (usually 25' x 43') is the most common house plot in Karachi. Most owners build ground + 1 for one family, or ground + 2 so that each floor can be a separate portion. This guide uses the same rates as our cost calculator, which our team updates as the market moves.

Covered area first

Construction is priced per square foot of covered area, not per square yard of plot. A 120 sq yd plot is 1,080 sq ft. After front and rear open spaces and the car porch, a typical ground floor covers about 70% of the plot and the upper floors about 80%, plus a mumty (stair room) on the roof:

  • Ground + 1: about 1,800 sq ft covered
  • Ground + 2: about 2,664 sq ft covered

Your actual covered area depends on the bylaws for your plot and the design. Our 120 sq yd G+2 design, for example, has about 2,370 sq ft.

Estimated cost (October 2026)

Finishing levelGrey + finishing per sq ftGround + 1Ground + 2
StandardRs 2,900 + 3,700 = Rs 6,600Rs 1.19 croreRs 1.76 crore
PremiumRs 3,300 + 5,200 = Rs 8,500Rs 1.53 croreRs 2.26 crore
LuxuryRs 3,700 + 7,500 = Rs 11,200Rs 2.02 croreRs 2.98 crore
Grey structure only (standard)Rs 2,900Rs 52.2 lakhRs 77.3 lakh

These are planning estimates that include material and labour. They do not include the plot, SBCA approval and design fees, utility connections, furniture or air conditioners. For a live figure with your own options, use the calculator.

What changes the price

  • Cement and steel prices. Together they are a large part of the grey structure cost, so a change in steel rates moves the whole budget. See current material rates.
  • Soil and foundation. Weak or filled soil may need a deeper or raft foundation. A soil test before design avoids surprises.
  • Structure design. Column sizes, slab thickness and steel depend on the structural design; a good design is both safe and economical.
  • Finishing choices. Tiles, sanitary ware, kitchen and woodwork can double the finishing cost between standard and luxury.
  • Supervision. Wasted material and rework cost more than supervision. Weekly checks of steel, concrete and curing pay for themselves.

Typical time

Grey structure of a 120 sq yd G+2 house usually takes around 5–7 months and finishing a further 4–6 months, depending on weather, payments and design changes.

Next step

Send us your plot details and we will prepare a BOQ and a fixed quote with a payment schedule. Book a free consultation.